Building a Multiplex in Killarney, East Vancouver: Lot Sizes, Zoning and What Owners Are Actually Building

By Costar Construction

Frequently asked questions

How many units can I build on a Killarney lot in Vancouver?

Most Killarney lots carry R1-1 (Residential Inclusive) zoning. Under that zone, a lot with at least 10 metres of frontage qualifies for 3 to 4 units. A lot with at least 13.4 metres of frontage qualifies for 4 to 5 units. A lot with at least 15.1 metres of frontage qualifies for 6 ownership-strata units, or 8 secured rental units. Killarney has more wider-than-standard lots than much of Vancouver, so the 5- and 6-unit band is achievable there without searching as hard.

What is the lot size of a standard Vancouver lot in Killarney?

The standard Vancouver residential lot is 33 feet (10.06 metres) wide by 122 feet deep, which gives a total of about 374 square metres. In Killarney many lots depart from that standard. Post-war subdivision left blocks with 40- to 52-foot-wide lots alongside the 33-foot standard. A 40-foot lot clears the 13.4-metre (44-foot) threshold for the 4-to-5-unit band under R1-1, which is why lot width is the first number to check.

What is the R1-1 zone and how does it apply to Killarney?

R1-1, the Residential Inclusive zone, replaced Vancouver's single-house zones across the city on October 17, 2023, following Council approval on September 14, 2023. It covers roughly 65,000 lots, including most single-family-zoned lots in Killarney. R1-1 allows a multiplex, which Vancouver defines as 3 to 8 homes on one site where every unit has its own direct exterior entrance. The rules are set in the R1-1 District Schedule, and every lot still needs to be checked individually because floodplain exclusions and lane access requirements apply.

Is Killarney a transit-oriented development zone for more units?

BC law requires cities to allow at least 6 units on lots larger than 280 square metres within 400 metres of a bus stop served by a route that runs at least every 15 minutes on average during set daytime hours. Killarney sits farther from SkyTrain than most of Vancouver's high-permit areas: the closest Expo Line stations (Joyce-Collingwood and 29th Avenue) are 15 to 25 minutes on foot from the interior of the neighbourhood. Bus routes 49 and 26 run through the area, and lots within 400 metres of a stop on those routes may qualify for the 6-unit transit-adjacent minimum. Confirm your specific address with the City's Development and Building Services Centre.

How many multiple dwelling building permits did Killarney receive in 2025?

The City of Vancouver issued 15 new-building permits in the Multiple Dwelling category in the Killarney local area in 2025, according to the City's open building permit data. Neighbouring Kensington-Cedar Cottage, which covers the area between Fraser Street and Nanaimo Street from Broadway south to East 41st Avenue, received 48 permits in the same category in 2025, making it the highest-volume local area in the city for that year.

Does a Killarney lot need lane access to qualify for a multiplex?

Yes. The City's multiplex rules require rear-lane vehicular access as a condition of eligibility under the standard R1-1 multiplex rules. Killarney has a good lane network inherited from its post-war subdivision pattern, but not every lot has lane access. Check the City's zoning map at maps.vancouver.ca/zoning and confirm lane access with the City before commissioning design work.

What did Costar build at 2333 East 54th Avenue in Killarney?

We Killarney Townhomes is a 6-plex multiplex at 2333 E 54th Ave in Vancouver's Killarney local area. Costar's scope for that project was pre-design, permit and construction management. The project is in Killarney between Rupert Street and Boundary Road, near Captain James Cook Elementary at 3340 E 54th Avenue. A living room from the project is shown on the project page.

How long does it take to get a building permit for a multiplex in Vancouver in 2026?

We cannot give a number of months for a Killarney multiplex, because vancouver.ca refused automated requests when we checked on October 17, 2026. The Architectural Institute of BC reported on August 6, 2025 that Vancouver has a combined process for applying for the development permit and the building permit together, for R1-1, RT-7 and RT-9 sites and exactly 3 to 4 units in 2 buildings, and it gave no months. Ask the City's Development and Building Services Centre for the current time.

What is the difference between building in Killarney versus Kensington-Cedar Cottage for a multiplex?

Both neighbourhoods are in Vancouver's east side, but they differ in zoning complexity. Killarney is predominantly R1-1, so eligibility is mostly a matter of frontage and lane access. Kensington-Cedar Cottage has a mix of R1-1 and RT-10 zones. Lots in the RT-10 zone were until recently limited to a lower floor space ratio and required conditional approval for more than two units. Under the Province's Bill 25 changes, effective after November 2025, Vancouver must bring RT-10 lots into SSMUH compliance by June 30, 2026. Land costs also differ: Killarney's lower prices give builders more room in the budget, while Kensington-Cedar Cottage's Trout Lake proximity commands a premium.