Multiplex and Laneway Home Rules in New Westminster: What the RGO-A and RGO-B Infill Zones Allow a Homeowner

By Costar Construction

Frequently asked questions

How many units can I build on my lot in New Westminster in 2026?

Under New Westminster's Infill Housing Program, adopted in June 2026, lots zoned RGO-A allow up to 4 homes and lots zoned RGO-B allow up to 6, counting secondary suites. The City says about 1,900 properties were zoned RGO-A and about 1,100 RGO-B. Check your address on the City's map of infill properties before you design.

Do I need to rezone my New Westminster lot to build a fourplex?

No rezoning is needed on a lot the City has already zoned RGO-A or RGO-B. The City's Infill Housing Guide (approved June 9, 2026) says an infill project needs a Development Permit, a Building Permit and a Tree Permit, and some projects also need a Heritage Alteration Permit. A rezoning is still needed for rowhouses, where each home sits on its own lot.

Is parking required for a multiplex in New Westminster?

The City's Infill Housing Guide says no minimum residential parking is required for properties within 400 metres of a prescribed frequent bus stop or in a Transit Oriented Development Area. Elsewhere, parking follows the rates in the Zoning Bylaw, and on RGO-B lots parking is required only inside a mapped area attached to that zone. Every project must provide secure bicycle parking.

Can multiplex units in New Westminster be sold separately as strata?

The City's Infill Housing Program page says infill housing units can be stratified, and the RGO zones allow rental, ownership or a mix. Secondary suites are the exception: the zoning bylaw says a suite stays in the same building as its principal home and cannot be strata titled separately.

Can I build a laneway house in Queensborough?

The City's laneway and carriage house page says the Queensborough Plan does not allow laneway or carriage houses. The City also says it has not changed housing rules in Queensborough yet, because more study is needed on its water and sewer systems, and it received a provincial extension to May 4, 2029.

Who pays for sewer and water upgrades for a New Westminster multiplex?

The City says its pipes were designed for up to three homes per lot, and that projects with more than three homes built before the City's own upgrades must pay for all necessary infrastructure upgrades. Before a Building Permit is issued, you sign a Works and Services Agreement for off-site work and provide a security deposit.

Does a New Westminster multiplex need an architect?

The City's Infill Housing Guide says a registered architect is required for buildings of 600 square metres (6,458 square feet) or more, or with 5 or more dwelling units. Smaller projects may use a design professional, along with engineers and an arborist as the project needs.

Do I need a demolition permit to tear down a house in New Westminster before building a multiplex?

Yes. The City of New Westminster says you must apply for a demolition permit before demolishing a building. A Utility Clearance Form is also required to confirm the utilities have been disconnected. The City asks for a site plan showing what will be built after the demolition.