Multiplex Zoning and Permits in Vancouver: Unit Limits, City Fees and Permit Route

By Costar ConstructionUpdated November 9, 2026

Frequently asked questions

How many units can I build under Vancouver's R1-1 zoning?

Vancouver's R1-1 zoning allows a multiplex of 3 to 8 dwelling units on one site, where every unit has its own direct exterior entrance, according to the City's multiplex project page. The eight-unit option applies only to secured rental housing, and the exact number a specific lot qualifies for depends on its frontage and lot size.

What lot frontage does a multiplex need in Vancouver?

Vancouver's R1-1 District Schedule sets frontage minimums by unit count: 10 metres for 3 to 4 units, 13.4 metres for 4 to 5 units, and 15.1 metres for 6 strata units or 8 rental units. A narrower lot qualifies for fewer units regardless of its total area, so frontage is often the binding constraint before lot size becomes one.

What is Vancouver's Development Cost Levy for a multiplex?

Vancouver's city-wide Development Cost Levy is charged per square metre of gross floor area at building permit issuance. Council approved a temporary 20 percent reduction on December 10, 2025, lowering the rate from $62.35 to $49.88 per square metre through September 30, 2026. A new Amenity Cost Charge was planned to start that day, and HAVAN and Daily Hive reported a staff proposal to continue the reduction. We have not confirmed what applies now, so ask the City for the rate on your permit date.

How is the Development Cost Levy paid on a Vancouver multiplex?

For a total levy under $500,000, which covers most multiplex projects, the City of Vancouver allows payment in three equal installments with no interest charged: one third at building permit issuance, one third at the 12-month mark, and the final third at 24 months. This spreads the fee across the build rather than requiring the full amount upfront.

How long does it take to get a building permit for a multiplex in Vancouver?

The City's news release of June 9, 2026 says its streamlined Development Building Permit process for certain multiplexes cut processing times by 50%, and it gives no month figure for multiplexes. For multi-family and mid-rise homes as one group, development permits took 9.8 months in 2025, down from 18.1 months in 2023. Ask the City's Development and Building Services Centre for the current time on your project.

Can a multiplex be built on any lot in Vancouver?

No. The City's multiplex project page excludes sites in the Designated Floodplain, which covers areas along False Creek, the Fraser River and Still Creek. A lot must also meet the minimum frontage and lot size for its target unit count, and every site rule should be confirmed with the City's Development and Building Services Centre before design starts.

Does using a pre-approved design speed up a multiplex permit?

We have not confirmed that it does. CMHC's Housing Design Catalogue lists the City of Vancouver as a local partner, and the supported designs shown for Vancouver are BC ADU 01, Duplex and Rowhouse (page marked as of July 22, 2026). The page shows no fourplex or larger multiplex design for Vancouver, so ask the City whether a catalogue design applies to your project and what it changes in review.

What does Costar handle during multiplex permitting?

Costar's multiplex projects are listed as pre-design, permit and construction management, meaning Costar carries a project from initial design through permitting and into construction, coordinating subtrades and inspections at each stage. This gives the client one point of contact through the permitting stage rather than managing the application separately from the build.